ANALISIS EFISIENSI TEKNIS DAN EKONOMIS PEMBANGKIT LISTRIK TENAGA MIKROHIDRO MENGGUNAKAN HOMER (STUDI KASUS PLTMH PAKEM)
DOI:
https://doi.org/10.23960/jitet.v13i3S1.7869Abstract Views: 73 File Views: 53
Keywords:
Micro-Hydro Power Plant; Technical Efficiency; Economic Efficiency; HOMER; Renewable EnergyAbstract
This study analyzes the power efficiency of a Micro-Hydro Power Plant (PLTMH) in the Pakem area using HOMER software. Water demand increased from 7.83 liters/second in 2009 to a projected 15.61 liters/second by 2027, with an average water flow of 1.76 liters/second. The simulation results show that the PLTMH can generate 27,645 kWh per year, with 100% of the energy coming from hydropower. About 6.52% of the energy is used for local needs, while 93.5% is sold to the grid. The PLTMH operates at a capacity factor of 128%, with a low annual operating cost of Rp 92.12. The Net Present Cost (NPC) is recorded at Rp 38,081.26, and the Levelized Cost of Energy (COE) is Rp 0.06613/kWh. The PLTMH in Pakem demonstrates high efficiency both technically and economically, but increasing water demand in the future will require system optimization to maintain sustainable operations.
Downloads
References
A. Gunawan, A. Oktafeni, and W. Khabzli, “Pemantauan Pembangkit Listrik Tenaga Mikrohidro (PLTMH),” J. Rekayasa Elektr., vol. 10, no. 4, pp. 202–206, 2014, doi: 10.17529/jre.v10i4.1113.
A. S. Hidayat and E. P. Hidayat, “Pengujian Tegangan Tembus Isolasi Padat pada Kondisi Lembab,” J. Ilm. Tek. Elektro, vol. 2, no. 1, pp. 9–18, 2004.
R. R. Aprilianto, A. Fungkas, and S. E. Wahyuni, “Analisis Perencanaan Pembangkit Listrik Tenaga Mikrohidro untuk Desa Terpencil,” J. Tek. Sipil dan Elektro, vol. 5, no. 2, pp. 45–52, 2013.
D. E. Fauziah, “Kajian Potensi Sumber Daya Air Kabupaten Lampung Barat,” J. Sumber Daya Air, vol. 1, no. 1, pp. 1–10, 2015.
M. B. Isnaeni, “Evaluasi Jaringan Listrik Pembangkit Listrik Tenaga Mikrohidro Cokro Tulung Kabupaten Klaten,” Media Elektr., vol. 6, no. 1, pp. 13–34, 2013.
M. Zaini, S. Safrudin, and M. Bachrudin, “Perancangan Sistem Monitoring Tegangan, Arus dan Frekuensi pada Pembangkit Listrik Tenaga Mikrohidro Berbasis IoT,” TESLA J. Tek. Elektro, vol. 22, no. 2, pp. 139–145, 2020, doi: 10.24912/tesla.v0i0.9081.
S. S. Murni and A. Suryanto, “Analisis Efisiensi Daya Pembangkit Listrik Tenaga Mikrohidro Menggunakan HOMER (Studi Kasus PLTMH Parakandowo Kabupaten Pekalongan),” J. List. Instrum. dan Elektron. Terap., vol. 1, no. 2, pp. 34–38, 2021, doi: 10.22146/juliet.v1i2.61282.
T. A. Akbar, “Analisa Pengaruh Ketinggian dan Debit Air Terhadap Energi Listrik pada PLTMH Desa Girikerto,” J. Electr. Eng., vol. 2, no. 1, pp. 1–29, 2018.
Dinas Energi dan Sumber Daya Mineral Jawa Tengah, Profil Sektor ESDM di Jawa Tengah Tahun 2018, Semarang: ESDM Jateng, 2018.
A. Nugroho, “Daya Terserap Pembangkit Listrik Tenaga Mikrohidro Karangtalun yang Digabung dengan PT PLN (Persero),” E-Journal Undip, vol. 17, no. 1, pp. 25–33, 2015.
S. Sukamta, H. Ananta, and M. K. Aini, “Studi Analisis Pembangkit Listrik Tenaga Mikrohidro di Kedung Sipingit Desa Kayupuring, Kecamatan Petungkriyono, Kabupaten Pekalongan,” Edu Elektrikal J., vol. 7, no. 1, pp. 27–33, 2018.
N. Kurniasih, “Analisa Mode Sistem Pembangkit Listrik Tenaga Hibrid Mikrohidro–Photovoltaic Array,” J. Tek. Elektro, vol. 9, no. 2, pp. 55–62, 2015.
D. P. Cahyani, A. Rizaldi, and T. Hidayat, “Rancang Bangun Pembangkit Listrik Tenaga Bayu (PLTB) Skala Kecil dengan Menggunakan Generator Sinkron Magnet Permanen,” J. Inform. Tek. Elektro Terap., vol. 13, no. 1, pp. 59–66, Apr. 2025, doi: 10.23960/jitet.v13i1.6395.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 Jurnal Informatika dan Teknik Elektro Terapan

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.