PLTS Off-Grid System Planning for Electricity Needs in Oil Palm Plantations

Authors

  • Pep Rizal Polteknik Manufaktur Negeri Bangka Belitung

DOI:

https://doi.org/10.23960/jitet.v13i3.6840

Abstract Views: 43 File Views: 34

Keywords:

Off-Grid Solar Power Plant; Palm Oil Plantation; Solar Energy; Proteus.

Abstract

Palm oil plantations are one of the important sectors in the growth of the economy in Indonesia. One of the oil palm plantation areas in the Pasaman Barat Regency is being developed with an estimated land area of 100 hectares. However, due to the location of the land being far from settlements, there is currently no electricity supply that can be used for the operational needs of the land. This research provides a solution for the planning of an Off-Grid solar power plant (PLTS). The method used is a descriptive method with a quantitative research type. Berdasarkan perhitungan, jumlah panel PV yang diperoleh adalah 14 unit, menghasilkan total daya sebesar 2397,89 W, perhitungan kapasitas SCC adalah 35 A, memerlukan kapasitas baterai 12V/100Ah 2 unit, dan inverter 3 kW untuk menghasilkan tegangan AC. The calculation of the Bill of Quantities (BoQ) for material needs amounts to Rp. 21,986,000. This result indicates that the planning of the solar power system is feasible for the long-term operational needs of the plantation, which only requires initial construction capital.

Downloads

Download data is not yet available.

References

L. M. Kwee, H. Hashim, H. P. Ying, H. W. Shin, N. A. Yunus, and L. J. Shiun, “Biogas generated from palm oil mille ffluent for rural electrification and environmental sustainability,” Chemical Engineering Transactions, vol. 61, pp. 1537–1542, Oct. 2017, doi: 10.3303/cet1761254.

J. O. Ken, I. N. Setiawan, and I. W. Sukerayasa, “Desain Plts Off-Grid Berdasarkan Analisis Otonomi Baterai Lead Acid Opzv di Adidaya Workshop, Jakarta Barat,” Jurnal Spektrum, vol. 10, no. 3, p. 12, Sep. 2023, doi: 10.24843/spectrum 2023.v10.i03.p2.

A. H. Pandyaswargo, A. D. Wibowo, and H. Onoda, “Socio-techno-economic assessment to design an appropriate renewable energy system for remote agricultural communities in developing countries,” Sustainable Production and Consumption, vol. 31, pp. 492–511, Mar. 2022, doi: 10.1016/j.spc.2022.03.009.

H. B. Nurjaman and T. Purnama, “Pembangkit listrik tenaga surya (PLTS) sebagai solusi energi terbarukan rumah tangga,” Jurnal Edukasi Elektro, vol. 6, no. 2, pp. 136–142, Nov. 2022, doi: 10.21831/jee.v6i2.51617.

N. Maulana, Zamzami, Yassir, "Perencanaan Pembangkit Listrik Tenaga Surya (PLTS) Off-Grid Menggunakan Baterai Lithium-Ion Untuk Perkebunan di Desa Blang Pie," Jurnal Tektro, Vol.8, No.2, September 2024.

H. Gusmedi, R. P. Putra, and A. S. Samosir, “DESAIN PEMBANGKIT LISTRIK TENAGA SURYA (PLTS) ON-GRID 60 KWP,” Jurnal Informatika Dan Teknik Elektro Terapan, vol. 13, no. 1, Jan. 2025, doi: 10.23960/jitet.v13i1.5537.

M. Aksa, Radhiah, N. Safitri, "Rancang Bangun Pembangkit Listrik Tenaga Surya di Lahan Pertanian Sebagai Alternatif Sumber Energi, "Jurnal Tektro, Vol.8, No.2, September 2024.

B. E. Kodo, F. J. Likadja, Likadja, E. R. Mauboy, "Perancangan Pembangkit Listrik Tenaga Surya (PLTS) Off Grid pada Area Perkebunan Desa Bismarak," JTekEL: Jurnal Teknik Elektro, Vol. 1, No. 1, 2024.

B. Budiyanto and M. R. S. H. Prakoso, “Grid Parity pada Stasiun Pengisian Listrik Umum Menggunakan Sel Surya,” RESISTOR (elektRonika kEndali telekomunikaSI Tenaga liSTrik kOmputeR), vol. 5, no. 1, p. 21, May 2022, doi: 10.24853/resistor.5.1.21-24.

R. R. E. Putra, S. Afriani, N. P. Miefthawati, and M. Jelita, “Analisis Teknis-Ekonomi Pembangkit listrik tenaga hybrid Solar PV/Biogas Off Grid System,” Jurnal Sains Dan Teknologi Industri, vol. 18, no. 1, p. 17, Dec. 2020, doi: 10.24014/sitekin.v18i1.11695.

S. Suprianto, “Analisa Perhitungan untuk Pemasangan Sistem Pembangkit Listrik Tenaga Surya untuk Solar Home System,” Rekayasa Elektrikal Dan Energi, vol. 4, no. 1, pp. 60–67, Jul. 2021, doi: 10.30596/rele.v4i1.7827.

A. P. Nugroho and D. Kurniawan, “Potensi Pembangkit Listrik Tenaga Surya Rooftop di Gedung Mohammad Hatta, Universitas Proklamasi 45,” Jurnal Offshore Oil Production Facilities and Renewable Energy, vol. 5, no. 1, Jun. 2021, doi: 10.30588/jo.v5i1.935.

T. Pangaribowo, Y. Gunardi, M. H. I. Hajar, J. Andika, A. W. Dani, and F. Sirait, “Pelatihan Perancangan Rangkaian Elektronika dengan Menggunakan Software Proteus untuk Siswa PKBM Wiyata Utama Jakarta Barat,” Jurnal Abdidas, vol. 3, no. 1, pp. 191–197, Feb. 2022, doi: 10.31004/abdidas.v3i1.557.

H. Syahrizal and M. S. Jailani, “Jenis-Jenis Penelitian Dalam Penelitian Kuantitatif dan Kualitatif,” Jurnal QOSIM Jurnal Pendidikan Sosial & Humaniora, vol. 1, no. 1, pp. 13–23, May 2023, doi: 10.61104/jq.v1i1.49.

R. I. R. Anwar, U. T. Kartini, L. Anifah, T. Wrahatnolo, "Analisis Albedo Terhadap Radiasi Matahari pada Plts Bifacial Menggunakan Decision Making Di PTIndonesia Power UBP GRATI," Jurnal Ilmiah Sain dan Teknologi, vol. 3, No. 3: 808-815, Januari 2025.

A. Manab, I. T. H, A. Rabiula, and H. Matalata, “Perencanaan Pembangkit Listrik Tenaga Surya Sistem Off-Grid di Desa Bungku Kecamatan Bajubang Kabupaten Batanghari Jambi,” Journal of Electrical Power Control and Automation (JEPCA), vol. 5, no. 2, p. 61, Dec. 2022, doi: 10.33087/jepca.v5i2.78.

A. A. Anggorowati, R. Sitepu, and A. Joewono, “Penggunaan Pembangkit Listrik Tenaga Surya Hybrid-Ongrid di Lahan Tandus Desa Curah Cottok,” Buletin Profesi Insinyur, vol. 4, no. 1, pp. 13–17, Mar. 2021, doi: 10.20527/bpi.v4i1.93.

I. Irawati, S. Sunardi, and A. Nurwanto, “Rancang Bangun Alat Pakan Ikan Otomatis Berbasis Catuan Panel Surya,” JEIS Jurnal Elektro Dan Informatika Swadharma, vol. 3, no. 1, pp. 22–30, Jan. 2023, doi: 10.56486/jeis.vol3no1.288.

Downloads

Published

2025-07-17

How to Cite

Rizal, P. (2025). PLTS Off-Grid System Planning for Electricity Needs in Oil Palm Plantations. Jurnal Informatika Dan Teknik Elektro Terapan, 13(3). https://doi.org/10.23960/jitet.v13i3.6840

Issue

Section

Articles