KAJIAN EFEKTIFITAS INVESTASI PEMBANGUNAN PEMBANGKIT LISTRIK TENAGA MINIHIDRO WAY SEKAMPUNG DARI SEGI OPERASIONAL KELISTRIKAN DAN FINANSIAL
Abstract
Downloads
References
Bidang Perencanaan Umum Dan Program BBWS Mesuji Sekampung (2020) Potensi Pembangkit Listrik di Bendungan Way sekampung, Paparan Balai Besai Wilayah Sungai Mesuji Sekampung.
Marsudi, D. (2006) Operasi Sistem Tenaga Listrik, Graha Ilmu, Jakarta.
Mulyono, P. (2020) Ekonomi Teknik, Gadjah Mada University Press, Yogyakarta.
Nama, G. F., & Despa, D. (2016, October). Real-time monitoring system of electrical quantities on ICT Centre building University of Lampung based on Embedded Single Board Computer BCM2835. In 2016 International Conference on Informatics and Computing (ICIC) (pp. 394-399). IEEE.
Navigant study (tautan https://hydro.org)
Sukandarrumidi., Kotta, H. Z., Wintolo, D. (2015), Energi Terbarukan, Konsep dasar menuju kemandirian Energi, Gadjah Mada University Press, Yogyakarta



