Analisis Level Keselamatan Kerja (K3) Proyek Konstruksi Terhadap Risiko dan Manajemen K3 (Studi Kasus : Proyek Pembangunan Terminal II Bandara Radin Inten II, Gedung Parkir Bandara Radin Inten II, Showroom Auto 2000)
DOI:
https://doi.org/10.23960/jrsdd.v4i4.550Abstract Views: 72 File Views: 0 File Views: 0
Abstract
Whetherconstructionutilizingsimpleorcomplextechnology,theyarealwayspronetorisk of accidents.Applyingmanagementofoccupationalsafetyandhealthisveryimportantbecauseit cancreateagoodandsecureworkingenvironment.Howeverallitneedscommitmentfrom all stakeholdersto besuccessful.
Thepurpose ofthisresearchistoassesthe implementationofsafetymanagementsystemin constructionprojects,identifyandquantifytheriskofaccidenteventsinconstructionprojects. Theresearchinvolvesquestionnairestogatherthemtheinformation. Therespondentscamefrom the projectcasesofstationII developmentRadinIntenIIairport,developmentofmulti-storeycar parkRadin Inten IIairport and developmentof auto 2000 showroom soekarno-hatta.
This analysis was utilizing SPSS and the methode of analysis was frequency, validity and reliability test.Theresultsshowthatallthe threeprojectcaseshasamedium risk dueto accident causedbyignoring thesafetystandards and procedureareobvious.
Keywords:Risk Management,Healthand SafetyEnvironment(SHE),SafetyManagement
Downloads
Additional Files
- Analisis Level Keselamatan Kerja (K3) Proyek Konstruksi Terhadap Risiko dan Manajemen K3 (Studi Kasus : Proyek Pembangunan Terminal II Bandara Radin Inten II, Gedung Parkir Bandara Radin Inten II, Showroom Auto 2000)
- Analisis Level Keselamatan Kerja (K3) Proyek Konstruksi Terhadap Risiko dan Manajemen K3 (Studi Kasus : Proyek Pembangunan Terminal II Bandara Radin Inten II, Gedung Parkir Bandara Radin Inten II, Showroom Auto 2000)
Published
How to Cite
Issue
Section
License

JRSDD is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.