Evaluasi Kinerja Angkutan Massal Bus Rapid Transit Pada Koridor Rajabasa - Sukaraja

Authors

  • Nurfadli Muhammad
  • Dwi Heriyanto
  • Priyo Pratomo

DOI:

https://doi.org/10.23960/jrsdd.v3i2.454

Abstract Views: 121 File Views: 91 File Views: 439

Abstract

The growing population and the increasing economic growth in the city of Bandar Lampung have
led to expanding geographic mobility within the city. The provision of a mass transit system,
therefore, is vastly indispensable for anticipating high traffic densities. This study was trying to
examine whether the operational performance of trans-Bandar Lampung buses, or called “Bus
Rapid Transit” (BRT), has conformed to the existing standards. The results are expected to be
taken for consideration by the municipal government when adopting policies to improve BRT’s
operational performance and to scale back traffic jams.
The study focused only on one corridor, the Rajabasa-Sukaraja corridor, and used the World Bank
(1986) standards as the reference. Observations were then made in three days: Monday and
Thursday to represent workdays, and Sunday to represent days off, with each observation day
spanning from 6.00 a.m. to 6.00 p.m.
The results reveal that time headway, 6.29 minutes (on the Rajabasa-Sukaraja corridor), and trip
speed, 25.45 km/h, have met the World Bank’s standards. However, traveled distance, 112.36 km
per vehicle, and load factor, 20.53%, are below the given standards. This low load factor has led to
small revenue per vehicle, i.e. only Rp346,503.56. Dividing the amount by the operating cost
(operating ratio) per vehicle gives us a value of 0.7 (less than 1). In other words, the BRT system
has been operating at a loss.
In the final analysis, it is vital that the municipal government take strategic policies to reduce the
number of minibuses, or angkot, that operates on the same corridor as the BRT buses’, so that
more passengers will shift to these BRT buses. The government should also grant subsidies
immediately to make up for the loss currently being suffered by this BRT.
Keyword : BRT, trans-Bandar Lampung bus, Rajabasa, Sukaraja, time headway, load factor.

Downloads

Download data is not yet available.

References

PP RI., 1993, Peraturan Pemerintah Nomor 41 Tahun 1993 tentang Angkutan Jalan,

Direktorat Jenderal Perhubungan Darat, Jakarta, 45 hlm.

PERMEN RI., 2005, Peraturan Menteri Perhubungan Nomor KM. 49 Tahun 2005 tentang

Sistem Transportasi Nasional (Sistranas), Menteri Perhubungan Republik Indonesia,

Jakarta, 115 hlm.

PERMEN RI., 2012, Peraturan Menteri Perhubungan Nomor PM. 10 Tahun 2012 tentang

Standar Pelayanan Minimal Angkutan Massal Berbasis Jalan, Menteri Perhubungan

Republik Indonesia, Jakarta, 21 hlm.

Hefrianto, Tomy, 2008, Enaluasi Kinerja Angkutan Umum Bus Transjakarta rute

Ragunan-Kuningan (Koridor IV), (Skripsi), Universitas Lampung, Bandar Lampung,

pp.

World Bank, 1986, Urban Transport.

Warpani, S.P., 1990, Merencanakan Sistem Perangkutan, Institut Teknologi Bandung,

Bandung. 191 hlm.

Wright, Lioyd, 2003, Bus Rapid Transit. University Collage London, United Kingdom,

Pp 88.

Downloads

Published

2015-06-01

How to Cite

Muhammad, N., Heriyanto, D., & Pratomo, P. (2015). Evaluasi Kinerja Angkutan Massal Bus Rapid Transit Pada Koridor Rajabasa - Sukaraja. Jurnal Rekayasa Sipil Dan Desain, 3(2), hal. 205 – 220. https://doi.org/10.23960/jrsdd.v3i2.454

Issue

Section

Makalah Ilmiah Edisi Juni 2015