Perencanaan Ulang Struktur Jembatan Way Magnay di Ruas Jalan Krui-Biha Kabupaten Pesisir Barat

Authors

  • susanto susanto
  • Mohd Isneini
  • Hasti Riakara Husni
  • Bayzoni Bayzoni

DOI:

https://doi.org/10.23960/jrsdd.v11i1.2988

Abstract Views: 78 File Views: 72 File Views: 0

Abstract

Abstract

Way Magnay Bridge is a reinforced concrete bridge span 2 x 25 m as liaison between Krui – Biha Regency West Coast . Way magnay bridge have width 6.42 m with traffic lane width 4.5 m. Base the load used in redesign of this bridge is SNI 1725-2016 and load earthquake use SNI regulations 2833-2016. Based on calculations that have been done , obtained reinforcement plate floor vehicle use flexural reinforcement D16 – 75 mm whereas reinforcement for used D10 – 295 mm. Girder transverse obtained main reinforcement 4D25 and reinforcement shear Ø10 -350 mm. Girder elongated obtained flexural reinforcement 20D34, reinforcement press 8D32, shear reinforcement Ø22 – 150 mm and shrink reinforcement 4D29. for pile cap abutments obtained flexural reinforcement direction x D25 – 130 mm, flexural reinforcement y direction D25 – 150 mm, shear reinforcement direction x Ø19 – 130 mm and shrink reinforcement D22 – 150 mm, Rim obtained flexural reinforcement D32 – 80 mm and shrink reinforcement D25 – 90 mm, Back wall obtained flexural reinforcement D22 – 200 mm and shrink reinforcement D22 – 85 mm, meanwhile for Foundation pole stake obtained main reinforcement 4D13 and shear spiral reinforcement Ø12 – 50 mm with total 10 piles

 

Keywords : Redesign bridge , Reinforced concrete bridge , Way Magnay

Downloads

Download data is not yet available.

Downloads

Published

2023-03-01

How to Cite

susanto, susanto, Isneini, M., Husni, H. R., & Bayzoni, B. (2023). Perencanaan Ulang Struktur Jembatan Way Magnay di Ruas Jalan Krui-Biha Kabupaten Pesisir Barat. Jurnal Rekayasa Sipil Dan Desain, 11(1), Hal. 9 – 18. https://doi.org/10.23960/jrsdd.v11i1.2988

Issue

Section

Makalah Ilmiah Edisi Maret 2023