Quantity Material Take Off Penulangan Kolom Zona B Gedung Perawatan Bedah Terpadu RSUD Dr.H. Abdul Moeloek dengan Building Information Modelling (BIM)

Authors

  • Mellynia Saputri Lampung Univesity http://orcid.org/0000-0001-5745-6066
  • Bayzoni bayzoni
  • Hasti Riakara Husni
  • Chatarina Niken Dwi wahyuni Setia Budi Utami

DOI:

https://doi.org/10.23960/jrsdd.v11i1.2982

Abstract Views: 217 File Views: 102 File Views: 0

Abstract

In this era of globalization, technology is growing rapidly in all aspects of life, including in the field of infrastructure. Technological developments in the field of infrastructure can be seen from the many softwares that facilitate development work. The software then comes packaged in a program called Building information Modeling (BIM). One of the software of Building information Modeling (BIM) is a Autodesk Revit which is able to automatically generate Material Quantity Take Off (QMTO) which is used by contractors in making Bill Of Quantity (BOQ). in Quantity Material Take Off (QMTO) an important aspect that must be considered is reinforcement or reinforcement work. Therefore, the researchers reviewed the Quantity Material take Off (QMTO) reinforcement, especially the column in the integrated surgery building, RSUD Dr. H. Abdul Moeloek. Based the research that has been done using Autodesk Revit software, there are difference in the value of column reinforcement volume between calculations using conventional methods. Base of the results of the analysis, the value of column reinforcement volume with conventional methods is greater than using the BIM-based method with percentage difference of 6,54 %. In addition, the percentage of waste material is quite large, namely 9,61 %. Key words : Building Information Modeling (BIM), Autodesk Revit, Quantity Material Take off (QMTO), column reinforcement, Waste Material .

 

Di era globalisasi ini, teknologi semakin berkembang pesat di seluruh aspek kehidupan termasuk dalam bidang infrastruktur. Perkembangan teknologi di bidang infrastruktur dapat dilihat dari banyaknya software-software yang memudahkan pekerjaan pembangunan. Software-software tersebut kemudian hadir dalam kemasan sebuah program yang disebut Building Information Modelling (BIM). Salah satu software dari Building Information Modelling (BIM) adalah Autodesk Revit yang mampu secara otomatis menghasilkan Quantity Material Take Off (QMTO) yang digunakan kontraktor dalam pembuatan Bill Of Quantity (BOQ). Pada Quantity Material Take Off (QMTO) aspek penting yang harus diperhatikan adalah tulangan atau pekerjaan penulangan. Oleh karena itu peneliti meninjau Quantity Material Take Off (QMTO) penulangan khususnya kolom pada Gedung Bedah Terpadu RSUD Dr. H. Abdul Moleoek. Berdasarkan penelitian yang telah dilakukan menggunakan Software Autodesk Revit terdapat perbedaan nilai volume penulangan kolom antara perhitungan menggunakan metode konvensional dan metode berbasis BIM. Berdasarkan hasil analisis didapat nilai volume penulangan kolom dengan metode konvensional lebih besar dibandingkan dengan menggunakan metode berbasis BIM dengan selisih persentase sebesar 6,54 %. selain itu didapatkan hasil persentase waste material yang cukup besar yaitu 9,61 %

Kata kunci : Building Information Modelling (BIM), Autodesk Revit, Quantity Material Take Off (QMTO), Tulangan Kolom, Waste Material .

Downloads

Download data is not yet available.

References

Abu-Hamd, M., Dina, A.S., and Mohamed, M., 2016. Application of 4D and 5D bim in

cold-formed steel residential buildings. Proceedings, Annual Conference -

Canadian Society for Civil Engineering, 4 (Figure 1), 2599–2608.

Alhasan, S., Kumar, B., and Thanikal, J. V., 2017. Effectiveness of implementing 5D

functions of Building information modeling on professions of quantity surveying - A

review. International Journal of Civil Engineering and Technology, 8 (5), 783–800.

Eastman, C., Teicholz, P., Sack, R., and Liston, K., 2011. BIM Handbook, a Guide to

Building Information Modelling 2nd ed. John Wiley & Sons, Inc, Hoboken. Canada.

Hergunsel, M.F., 2011. Benefits of Building Information Modeling For Construction

Managers and BIM Based Scheduling. Worcester Polytechnic Institute.

Kirby, L., Krygiel, E., and Kim, M., 2018. Autodesk® Revit® 2018. Canada.

Laorent, D., Nugraha, P., and Budiman, J., 2019. Analisa Quantity Take Off dengan

Menggunakan Autodesk Revit. Dimensi Utama Teknik Sipil, 6 (1), 1–8.

Mulyono, B., Zain, H.A., and Sudibyo, G.H., 2022. Analisis Perbandingan Efektifitas

Metode Konvensional Dan Bim Pada Elemen Struktur Beton (Studi Kasus Gedung

Pelayanan Pendidikan Fisip Unsoed). Jurnal DISPROTEK, 13 (1), 37–44.

Sangadji, S., Kristiawan, S.A., and Saputra, I.K., 2019. Pengaplikasian Building

Information Modeling (BIM) Dalam Desain Bangunan Gedung. Matriks Teknik

Sipil, 7 (4), 381–386.

Williams, J., Amor, R., Appleby, S., Boyden, G., Read, H., Hunter, D., and Reding, A.,

New Zealand BIM Handbook : New Zealand.

Downloads

Published

2024-06-27

How to Cite

Saputri, M., bayzoni, B., Husni, H. R., & Dwi wahyuni Setia Budi Utami, C. N. (2024). Quantity Material Take Off Penulangan Kolom Zona B Gedung Perawatan Bedah Terpadu RSUD Dr.H. Abdul Moeloek dengan Building Information Modelling (BIM). Jurnal Rekayasa Sipil Dan Desain, 11(1), Hal. 1 – 8. https://doi.org/10.23960/jrsdd.v11i1.2982

Issue

Section

Makalah Ilmiah Edisi Maret 2023