Manan, M. S., B. Bayzoni, and S. Sebayang. “Design and Analysis of Cable Stayed Bridge With 800 M Span”. Jurnal Rekayasa Sipil Dan Desain, vol. 6, no. 4, May 2019, pp. Hal. 411 - 420, doi:10.23960/jrsdd.v6i4.986.