Analisis Ekonomi dan Finansial Kereta Cepat Jakarta - Bandung

Authors

  • Oldebes Temy Giantara
  • Aleksander Purba
  • Dwi Herianto

DOI:

https://doi.org/10.23960/jrsdd.v6i4.930

Abstract Views: 804 File Views: 2294 File Views: 0

Abstract

Jakarta and Bandung city with a distance about 150 km must be taken more than three hours by highway or railway due to the ever-increasing mobility with limited infrastructure capacity.  This study analyzes the economic and financial feasibility of the Jakarta – Bandung high speed rail project and calculates the NPV, BCR, IRR, PI, and PP. The government through the SOE and China International Railway consortium initiated the construction of a high speed rail from Halim to Tegalluar with a 142,3 km rail length and an average speed of 250 km/h, construction began in 2015 and is expected to be completed by 2020. The analysis is done with assumption of 75% occupancy rate, with discount rate of 2% and 3,46%, and feasibility of the project by doing comparison of feasibility method that is NPV ≥ 0, BCR > 1, IRR > r, PI > 1, and PP is faster than NPV positive. In the highest value feasibility analysis obtained with 75% occupancy rate and discount rate 2%. If only calculate the economic benefits obtained value of NPV = 3.279.703.704,18 ≥ 0, BCR = 1,00 > 1, IRR = 6,45% > r, PI = 0,65 < 1, PP = 33,76 > 29 year. If only calculate the financial benefits obtained value of NPV = 8.677.268.827,83 ≥ 0, BCR = 1,01 > 1, IRR = 5,50% > r, PI = 0,79 < 1, PP = 34,47 < 38 year. If calculate the economic and financial benefits obtained value of NPV = 1.543.396.683.112,40 ≥ 0, BCR = 1,56 > 1, IRR = 105,46% > r, PI and PP can not be calculated because the positive value of NPV in the first year (2020).

Downloads

Download data is not yet available.

References

Abubakar, Iskandar, 1997, Financing Jakarta's Mass Transit System, Proceeding of The Eastern Asia Society for Transportation Studies, Vol. 1, Hal. 263-275.

De Rus, G, 2008, The Economic Effect of High Speed Rail Investment, Discussion Paper No. 2008-16, International Transport Forum, OECD, Paris.

Republik Indonesia, 1992, Undang-Undang No. 14 Tahun 1992 tentang Lalu Lintas dan Angkutan Jalan, Lembaran Negara RI Tahun 1992, No. 49, Sekretariat Negara, Jakarta.

Republik Indonesia, 2007, Undang-Undang No. 23 Tahun 2007 tentang Perkeretaapian, Lembaran Negara RI Tahun 2007, No. 65, Sekretariat Negara, Jakarta.

Republik Indonesia, 2015, Peraturan Menteri Perhubungan No. 111 Tahun 2015 tentang Tata Cara Penetapan Batas Kecepatan, Jakarta.

Republik Indonesia. 2017, Peraturan Menteri Keuangan No. 16/PMK.010/2017 tentang Besar Santunan dan Sumbangan Wajib Dana Kecelakaan Lalu Lintas Jalan.

Giatman, M, 2006, Ekonomi Teknik, Jakarta: PT RajaGrafindo Persada.

Ichsan, M, 1998, Studi Kelayakan Proyek, Universitas Brawijaya, Malang.

International Union of Railways, 2005, High Speed Rail's Loading Asset for Customers and Society, Publikasi UIC. Paris.

Kereta Cepat Indonesia China. 2016, http://kcic.co.id/ (26 September 2017).

Lembaga Afiliasi Penelitian dan Industri (LAPI) ITB, (1996), Laporan Akhir Studi Perhitungan Biaya Operasi Kendaraan-PT, Jasa Marga. ITB.

LPKM-ITB, 1997, Modul Pelatihan Perencanaan Sistem Angkutan Umum (Public Transport System Planning), Bandung: LPKM-ITB.

Maibach, M., Schreyer, C., Sutter, D., Van Essen, H.P., Boon, B.H., Smokers, R., Schroten, A., Doll, C., Pawlowska, B., dan Bak, M, 2007, Produced within the Study Internalization Measures and Policies for All External Cost of Transport, IMPACT.

Mardiana, Hendra, 2016, High Speed Railway (HSR) Jakarta – Bandung The Acceleration of Infrastructure in West Java, Jakarta, Indonesia.

PT Wijaya Karya, 2016, Keterbukaan Informasi, Jakarta.

Purba, Radiks, 1997, Analisis Biaya dan Manfaat, Jakarta: PT Rineka Cipta.

Siagian, Andre Jonathan, 2018, Analisis Ekonomi dan Finansial Shortcut Tegineneng – Tarahan, JRSDD, Vol. 6, No. 2.

Siagian, Rizky Torang Surya, 2015, Analisis Awal Kelayakan Ekonomi dan Finansial dalam Perencanaan Monorel Kota Medan, Jurnal Simposium International FSTPT Universitas Lampung.

Swijana, Ketut, dkk, 2007, Studi Kelayakan Jalan Tol Pengembangan – Pengragoan. Denpasar: Jurnal Ilmiah Teknik Sipil, Vol. 11, No. 1.

wikipedia.org, Kereta Api Argo Parahayangan, diakses di https://id.wikipedia/org/wiki/Kereta_api_Argo_Parahayangan, diakses pada tanggal 25 Juli 2018.

Downloads

Published

2018-11-07

How to Cite

Giantara, O. T., Purba, A., & Herianto, D. (2018). Analisis Ekonomi dan Finansial Kereta Cepat Jakarta - Bandung. Jurnal Rekayasa Sipil Dan Desain, 6(4), Ha. 323 – 334. https://doi.org/10.23960/jrsdd.v6i4.930

Issue

Section

Makalah Ilmiah Edisi Desember 2018