Project quality management is a process to keep the project still fulfilled the quality level based on the demand or plan. Quality Plan Agreement is Quality Management System document that is very important in construction project. This research’s aims are to assess the quality implementation level based on Descriptive Analysis Method on Upgrading Irigation Area Project Way Sekampung, Ground Sub-Job. Primary data is obtained by providing questionnaries within 39 questions to 8 respondents and secondary data is obtained by observation and documentation in project site. Descriptive Analysis obtaining 51,28% respondents answer Good; 27,56% respondents answer Very Good; 16,67% respondents answer Acceptable; 4,17% respondents answer Not Good; and 0,32% respondents answer Very Not Good.
Downloads
References
S. Tonchia, "Industrial Project Management : Industrial Standards and Best Practices for Engineering and Construction Conctracting," Springer, 2000.
Kementerian PUPR, "Peraturan Menteri Pekerjaan Umum dan Perumahan Rakyat tentang Sistem Manajemen Mutu (SMM) Departemen Pekerjaan Umum," Jakarta, 2009.
Kementerian Ketenagakerjaan, "Keputusan Menakertrans tentang Pedoman Pelaksanaan Sistem Manajemen Mutu ISO 9001 Bidang Penempatan Tenaga Kerja di Kabupaten/Kota," Biro Hukum Indonesia, 2014.
K. Fitri, "Pengaruh Kompetensi Karyawan dan Beban Kerja Terhadap Kinerja Karyawan Bank," Jurnal Online Mahasiswa Fakultas Ekonomi Universitas Riau 4 (1), 590-600, Pekanbaru, 2017.
D. Fitriana, dkk., "Pengukuran Kepuasan Kontraktor Terhadap Kinerja Klien Pada Proyek Konstruksi Swasta," Jurnal Karya Teknik Sipil vol 3 no 1 hal 283-295, Semarang, 2014.
Downloads
Additional Files
Published
How to Cite
Issue
Section
License
JRSDD is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.