Kajian Potensi Risiko Kecelakaan pada Stasiun LRT Palembang dengan Analisis Semi-Kuantitatif

Authors

  • Rahma Indah Rindiani Civil Engineering Student, Lampung University http://orcid.org/0009-0005-2441-0607
  • Kristianto Usman Lecturer in Department of Civil Engineering, Lampung University
  • Ika Kustiani Lecturer in Department of Civil Engineering, Lampung University
  • Amril Ma'ruf Siregar Lecturer in Department of Civil Engineering, Lampung University

DOI:

https://doi.org/10.23960/jrsdd.v11i3.3657

Abstract Views: 82 File Views: 72

Abstract

LRT is a mass transportation facility that supports public mobility, reduces air pollution and alleviates traffic congestion, also decreases public transportation cost. Risk management is very important in LRT to ensure the safety and security for users and employees services. This research aims are to identify and determine the potential risks of accidents based on each variable, also to know the level of accident risk that may impact users and employees safety on LRT Palembang. This research involves questionnarie surveys and semi-quantitative data analysis, also makes the accident risk profile for LRT Palembang. Based on data analysis, users risk profile score with 9 variables, 5 variables result in low risks with 4-8% percentage, and 4 other variables result in medium risk with 12-20% percentage. Operators risk profile score with 10 variables, 3 variables result in low risk with 8% percentage, and other 7 variables result in medium risk with 12-20% percentage.

Downloads

Download data is not yet available.

References

David Hilson, “Using a Risk Breakdown Structure in Project Management. Journal of Facilities Management,” 2003.

Magdalena, “Light Rail Transit Palembang,” 2021.

Muhyiddin, “Identifikasi Risiko,” Universitas Esa Unggul, 2020.

Gatot Nursetyo, “Kajian Manajemen Risiko Bisnis Jasa Konstruksi,” 2015.

Pengadilan Negeri Nanga Bulik Kelas II, “Analisis Manajemen Risiko,”

Peraturan Menteri Perhubungan Replublik Indonesia No 63, “Standar Pelayanan Minimum Angkutan Orang Denagn Kereta Api,” 2019.

Dwi Priyanta, “Keandalan dan Perawatan,” Institut Teknologi Surabaya, 2000.

Milton C Regan, “Risky Bussiness,” 2006.

Nurmala Sari, “Analisis Potensi Pengguna Light Rail Transit (LRT) di Stasiun Pasar Cinde Berdasarkan Rencana Pembangunan Pasar Cinde Palembang,” 2018.

Jackson Sekasi dan Habeeb Solihu, “Safety and Risk Analysis at Railway Crossing of North-South Addis Ababa Light Rail,” 2021.

Crishtina Evy Widyahening, “Penggunaan Teknik Pembelajaran Fishbone Diagram dalam Meningkatkan Keterampilan Belajar Siswa,” Universitas Veteran Bangun Nusantara, 2018.

Downloads

Published

2023-09-01

How to Cite

Rindiani, R. I., Usman, K., Kustiani, I., & Siregar, A. M. (2023). Kajian Potensi Risiko Kecelakaan pada Stasiun LRT Palembang dengan Analisis Semi-Kuantitatif. Jurnal Rekayasa Sipil Dan Desain, 11(3), Hal. 585 – 592. https://doi.org/10.23960/jrsdd.v11i3.3657

Issue

Section

Makalah Ilmiah Edisi September 2023