Follow-Up Queue Impact Due to The Closures of Perintis Kemerdekaan Railroad Crossing on Vehicle Velocity Decrement of Gatot Subroto Street

  • Renaldy Sugendra
  • Sasana Putra
  • Siti Anugrah Mulya Putri Ofrial
  • Rahayu Sulistyorini
DOI: https://doi.org/10.23960/jrsdd.v11i3.3562
Abstract Views (Last 12 Months)
159 Abstract Views
154 Downloads

Abstract

The closures of railroad crossing on Perintis Kemerdekaan Street frequently cause vehicle queues on Gatot Subroto Street. The density that happens on Perintis Kemerdekaan Street impacts on the occurrence the road constringency and vehicle velocity delay. The results with four hours of observation, the delay values can be concluded with shockwave analysis. 20,72 km/h is determined as for the value of forwarding forming shockwave (ωda) in morning observation and 9,08 km/h in the afternoon; with 1,32 km/h of backward forming shockwave (ωab) in the morning and -1,07 km/h in the afternoon; also forward recovery shockwave (ωdc) in the morning is 5,17 km/h and 1,98 km/h in the afternoon; as well with -10,64 km/h as the value for backward recovery shockwave (ωcb) in the morning and -4,10 km/h in the afternoon; as for the frontal stationary shockwave (ωac) the value is 4,73 km/h in the morning and 1,75 km/h in the afternoon. The mileage time increment is up from 4,25 to 7,6925 seconds in the morning and from 10,68 to 21,196 seconds in the afternoon.

Downloads

Download data is not yet available.

References

Direktorat Jendral Bina Marga. 1997. Manual Kapasitas Jalan Indonesia (MKJI). Standarisasi Nasional. Jakarta.

Direktorat Jendral Bina Marga. 2014. Pedoman Kapasitas Jalan Indonesia (PKJI). Departemen Pekerjaan Umum.

Idham, M., 2000. Analisis Gelombang Kejut pada Persimpangan Berlampu Lalu Lintas. (Skripsi). Politeknik Bengkalis, Riau.

Pesik, Belinda Septiani., Rompis, Semuel Y. R., Pandey, Sisca V. 2017. Study Pemanfaatan Lampu Lalu Lintas Untuk Penyebrangan Jalan dan Pengaruhnya Terhadap Panjang Antrian Kendaraan. Fakultas Teknik, Jurusan Teknik Sipil. Universitas Sam Ratulangi.

Salter, RJ & N.B. Hounsell, 1996, Highway Traffic Analysis and Design, The Macmillan Press Ltd

Soedirdjo, Titi Liliani. 2002. Rekayasa Lalu Lintas. Institut Teknologi Bandung. Bandung.

Tamin, O.Z. 2008. Perencanaan dan Pemodelan Transportasi. Bandung: Institut Teknologi Bandung.

Tungka, F. R., 2006. Analisis Gelombang Kejut pada Persimpangan Berlampu Lalu Lintas (Studi Kasus: Jl. Sam Ratulangi dengan Jl. Baru Karombasan). Universitas Sam Ratulangi Manado.

Cover
Published
2023-09-01
How to Cite
Sugendra, R., Putra, S., Ofrial, S. A. M. P. and Sulistyorini, R. (2023) “Follow-Up Queue Impact Due to The Closures of Perintis Kemerdekaan Railroad Crossing on Vehicle Velocity Decrement of Gatot Subroto Street”, Jurnal Rekayasa Sipil dan Desain (JRSDD), 11(3), pp. Hal. 513 – 522. doi: 10.23960/jrsdd.v11i3.3562.