Karunia, M. N., I. Kustiani, and A. M. Siregar. “ANALISIS RISIKO KETERLAMBATAN WAKTU PADA PROYEK (STUDI KASUS: PEMBANGUNAN JALAN TOL TRANS SUMATERA BAKAUHENI-TERBANGGI BESAR (Paket II Sidomulyo-Kotabaru Sta. 39+400 - Sta. 80+000) Dan (Paket III Kotabaru-Metro Sta. 80+000 – Sta. 109+000))”. Jurnal Rekayasa Sipil Dan Desain, vol. 4, no. 4, June 2018, doi:10.23960/jrsdd.v4i4.521.