Dwiana, Y., Putra, S. and Sulistyorini, R. (2021) “Effect of Delay due to U-Turn on Pangeran Antasari Road (Case Study U-Turn Near Ganesha Operation)”, Jurnal Rekayasa Sipil dan Desain, 8(4), pp. Hal. 831 – 840. doi: 10.23960/jrsdd.v8i4.1624.