MANAN, M. S.; BAYZONI, B.; SEBAYANG, S. design and analysis of cable stayed bridge with 800 m span. Jurnal Rekayasa Sipil dan Desain (JRSDD), [S. l.], v. 6, n. 4, p. Hal. 411 – 420, 2019. DOI: 10.23960/jrsdd.v6i4.986. Disponível em: http://journal.eng.unila.ac.id/index.php/jrsdd/article/view/986. Acesso em: 10 dec. 2025.