[1]
Manan, M.S., Bayzoni, B. and Sebayang, S. 2019. design and analysis of cable stayed bridge with 800 m span. Jurnal Rekayasa Sipil dan Desain (JRSDD). 6, 4 (May 2019), Hal. 411 – 420. DOI:https://doi.org/10.23960/jrsdd.v6i4.986.