[1]
Karunia, M.N., Kustiani, I. and Siregar, A.M. 2018. ANALISIS RISIKO KETERLAMBATAN WAKTU PADA PROYEK (STUDI KASUS: PEMBANGUNAN JALAN TOL TRANS SUMATERA BAKAUHENI-TERBANGGI BESAR (Paket II Sidomulyo-Kotabaru Sta. 39+400 - Sta. 80+000) dan (Paket III Kotabaru-Metro Sta. 80+000 – Sta. 109+000)). Jurnal Rekayasa Sipil dan Desain. 4, 4 (Jun. 2018). DOI:https://doi.org/10.23960/jrsdd.v4i4.521.