Abstract


 

This study aims to analyze the economic and financial viability of the Jakarta - Bandung high-speed railway using three scenarios, the best scenario, the medium scenario, and the worst scenario. Where the three scenarios are using 75% load factor with discount factor level of 2% and 3,46%. A project is considered feasible by comparing feasibility parameters, such as NPV, BCR, PI, EIRR / FIRR, and payback period. Based on the results obtained on the feasibility parameters used, showing the economic and financial feasibility analysis with the discount rate of 2% and 3,46% in the best, medium and worst scenario, the project is declared eligible to be built, due to the eligibility of economic feasibility.

 

Keywords:High-speed, economic feasibility, financial feasibility, feasibility parameters

 


Full Text:

pdf

References


Humam Santosa Utomo., 2010, Manajemen Transportasi, Pascasarjana Universitas Brawijaya, Malang.

Rotaris, L., Danielis, R., Marcucci, E., and Massiani, J., 2010, The Urban road pricing scheme to curb pollution in Milan, Italy: Description, impacts and preliminary cost-benefit analysis assessment. Transportation Research Part A, 44, 359-375.

De Rus, G., 2008, The Economic Effect of High Speed Rail Investment, Discussion Paper No. 2008-16, International Transport Forum, OECD, Pairs.

Tümay Celikkol-Kocak, Gülçin Dalkic., and Hediye Tuydes., 2017, Yaman High-Speed Rail (HSR) Users and Travel Characteristics in Turkey, Civil Engineering Department, Middle East Technical University, Ankara, Turkey.


Refbacks

  • There are currently no refbacks.


ISSN: 2303-0011